Hubbard-Totton Elevator Replacement
Project Scope
The project is to replace all elevator components all elevator components and the elevator car interior with recent code provisions. This requires architectural, mechanical, electrical and fire alarm work to comply with current North Carolina Building codes, as well as American Society of Mechanical Engineers (ASME) and State Construction Office (SCO) guidelines.
Current Status
The design is complete and approved for bid by the State Construction Office. The prebid meeting will be held on May 31, 2023, at 11 a.m. at the Walker PE Elevator. The bid opening will be June 20, starting at 3 p.m. Sealed proposals will be received until 3 p.m. on June 20, 2023, at the office of Alexandrea Jeffreys, Hubbard-Totton Building, Room 121, 1801 Fayetteville Street, Durham, NC 27707, at which time and place (Hubbard-Totton Building, Room 113, 1801 Fayetteville Street, Durham, NC 27707) the bids will be opened and read.