Capital Projects
Project Name | Project Scope | Project Completion Date |
---|---|---|
School of Education Building HVAC and BAS Controls Upgrade | The project includes the replacement of the building’s 2 chillers and 2 cooling towers, as well as replacement and expansion of the building’s pneumatic HVAC controls with digital controls. |
TBD |
Taylor Education Building Renovation | In phase 1, the project will focus on repairing the building enclosure and upgrading the building systems. |
TBD |
Lee Biology Building Renovation | In phase 1, the project will focus on repairing the building enclosure and upgrading building systems. |
TBD |
24/7 Collaborative Research and Learning Center (CLRC) | This center will be a modern, smart space for student collaboration, offering dedicated meetings, lounge, and study areas with flexible furniture and state-of-the-art technology. |
09-30-2025 |
Turner Law HVAC and BAS Controls Repairs | The project includes replacing the basement chiller and cooling tower, rooftop air-cooled chiller, MCC and standardizing BAS controls. |
TBD |
Farrison-Newton Communications Building (University Theatre) | The project will overhaul the 264-seater theater, upgrade stage lighting and control systems, renovate adjacent rooms, and modernize the carpentry and fabrication shop. |
TBD |
Dent Human Sciences Building Comprehensive Renovation | The project will modernize the HVAC system, enhance air ventilation and quality, and replace inefficient windows. |
TBD |
Edmonds Classroom Building Comprehensive Renovation | The scope of this project includes PME upgrades (HVAC, plumbing, electrical), window replacement, and cooling tower and chiller replacement. |
TBD |
WNCU Radio Station Renovation | The current footprint for the WNCU Radio Station includes the radio production area and the student production area, with the possibility of adding 250 square feet. |
10-31-2025 |